Home / About Us / Company

Company

One factory. One focus. One product category.

Founded in 2011 in Jinhu, China

Ginhong was founded in 2011 in Jinhu, Jiangsu — about three hours' drive from Shanghai. The founding team had spent the previous decade building mixers for other factories; they started Ginhong to build their own, the way they believed they should be built.

Fourteen years later, the focus has not changed. We build mixers — vacuum emulsifiers, high-shear mixers, planetary mixers, multi-shaft mixers and mixing tanks. Nothing else. Not filling lines, not packaging lines, not whole production lines.

Same factory. Same engineers. Same machine. Since 2011.

Ginhong factory — 8 Kanglou Road, Jinhu
FACTORY FACTS

By the Numbers

2011

Year founded. Same factory ever since.

88

Countries exported to. Every continent except Antarctica.

379

Customers served. 92% repeat buyers.

CE

European Declaration of Conformity on every machine. Documentation for FDA projects on request.

SS316L

Standard material on every contact part. Mirror-polished sanitary finish.

24h

Quote turnaround. Engineers reply to inquiries within 24 hours, every weekday.

HOW WE WORK

The Process, Step by Step

  1. Quotation (Day 1): Send us product type, batch size, capacity, viscosity and any photos of your current process. We reply within 24 hours with a model recommendation and indicative price.
  2. Proforma Invoice (Day 2–3): After your confirmation we issue a PI with machine spec, FOB Shanghai price, lead time, payment terms (40% T/T deposit, 60% before shipment) and shipping options.
  3. Production (15–35 working days): Workshop starts within 3 working days of deposit. We send you photos and short videos weekly so you see the build progress.
  4. Quality Control (3–5 days): Every machine is hydrostatic-tested on the jacketed vessel, motor run-tested under load, and video-inspected before packing.
  5. Documentation (parallel): CE Declaration of Conformity, material certificates, hydrostatic test report, FAT video and operation manual ship with the machine — digitally and in print.
  6. Sea freight (25–35 days): We pack in plywood cases suitable for export, book with our long-term forwarder (FOB Shanghai / EXW Jinhu / CIF your port) and provide the B/L within 3 days of loading.
  7. After-sales: Installation videos and remote guidance are free for life. On-site engineer visits are available — most buyers don't need them.

Visit the factory

If you're planning a sourcing trip to China, the Ginhong workshop is 3 hours from Shanghai. Send us your dates and we'll arrange the visit.

Plan a Visit →